Services
Painting & Wall Finishes
Good paint is 70% preparation. We start with the surface, then the colour.
About the service
The difference between paint that lasts and paint that peels starts before the tin is opened: crack repair, filling, sanding and the right primer. Then we approve samples on your actual wall in the room's real light, because a catalogue colour never looks the same at home.
What's included
- Crack repair, filling and sanding
- Primer and interior paint from samples approved on the wall
- Wallpaper and fabric wall coverings
- Decorative finishes (stucco, micro-cement look, textures)
Where this service makes the difference
Frequently asked
How many days does it take to paint a whole villa?
A mid-size villa takes about 2–3 weeks, including crack repair, filling, sanding, primer and two coats.
Is the paint safe for children's rooms?
We use low-VOC paints for interiors and recommend airing a room for 48 hours before use.
Often paired with
Need Painting & Wall Finishes?
We survey the space, listen to what you want, then send an initial concept and an itemised quote.