FAQ
Answers with numbers, not generalities
What villa owners ask most before a fit-out: cost, duration, payments, warranty and working while you live there.
Nothing matches that search. Ask us directly and we'll answer with numbers.
Ask on WhatsAppFAQ
How much does a villa fit-out cost in Abu Dhabi?
It depends on size, the villa's condition (a new shell or a home you live in) and the finish level. We don't quote a rate per m² before the site visit, because a number that isn't based on measurements changes later. After the visit you receive an itemised BOQ with quantities and a price for every line, so you can compare and decide with clarity.
How long does a project take?
A mid-size majlis takes about 6–8 weeks, a kitchen about 5–8 weeks and a full villa about 8–14 weeks from design approval. The exact date of every stage is written into the contract.
Is the site visit free?
Yes. Site visits in Abu Dhabi and Al Ain are free and carry no obligation. Your project engineer visits, takes measurements and photos, and talks through your needs, budget and target date.
How are payments split?
An advance when you sign, then payments tied to stages defined in the contract, and a final payment after handover once the snag list is closed. You never pay for a stage before you see it done.
What warranty do you give?
12 months on workmanship from handover, covering the joinery, gypsum, flooring, paint and fittings we installed. Materials and appliances carry the manufacturer's warranty, and we hand you the certificates in the handover file.
Are the photos on the website your projects?
Photos tagged "Completed project" are ours, published with the owner's consent. Photos tagged "Illustrative" are for inspiration only, and every image says which it is.
Majlis
Can you deliver the men's and ladies' majlis in one project?
Yes. We often share materials between them and give each its own character through colour and light.
How much does a majlis cost?
It depends on size, finish level and materials: wall panelling, flooring, ceilings and lighting. We don't quote a figure before seeing the room, because a number that isn't based on measurements changes later. After the site visit you receive an itemised BOQ with a price for every line.
Can the majlis be built while the family lives in the villa?
Yes. The majlis is usually separate from the rest of the home; we seal the work zone and agree working hours.
Interior Design & 3D Visualisation
Do I pay a design fee if you build the project?
No. If you sign the build contract with us, the design fee is fully credited against it, and the quotation says so in writing.
Will the finished space match the 3D visuals?
Yes in layout, materials and colours. We build from the same drawings, and each project page shows our design-versus-built photos.
Can I order the design only and build with someone else?
Yes. You receive the full working drawings and material board.
Turnkey Interior Fit-Out
How are payments structured?
An advance when you sign, then payments tied to stages defined in the contract, and a final payment after handover once the snag list is closed. You never pay for a stage before you see it done.
Can we live in the villa during the works?
Yes for most renovations. We phase the work, seal work zones against dust and agree working hours with your family.
What happens if the project runs late?
The contract sets a date for every stage. If anything threatens a date, we tell you in writing, with the reason and the revised programme, before the date and not after; delays on our side we recover at our own cost. We also publish whether each showcased project was delivered on schedule.
Joinery & Woodwork
Veneer or lacquer?
Veneer is a thin layer of real timber that shows the grain and warmth of wood. Lacquer is a smooth painted finish in one colour, matt or gloss. You see samples of both before approving.
How long does a full walk-in wardrobe take?
About 5–7 weeks from measurement to installation: a week for drawings and samples, 3–5 weeks in the workshop, and a few days to install and finish.
Gypsum Ceilings & Partitions
Will a gypsum ceiling crack over time?
Cracks usually come from uneven framing, untreated joints or moisture. We tape and fill joints in stages and add movement joints in large areas.
How long does a living room or majlis ceiling take?
A 50 m² ceiling with levels and cove lighting takes about 5–8 working days from framing to ready-for-paint.
Kitchens & Cabinetry
Marble or quartz?
Marble is unique in its veining but more sensitive to stains and acids. Quartz stands up better to daily use. Many families choose marble for the show island and quartz for the prep kitchen.
Do you supply appliances?
Either. We supply them within the quotation if you prefer, or coordinate appliances you buy yourself: we take their specifications before fabrication so every opening fits exactly.
Flooring & Tiling
Can new flooring go over the old one?
Sometimes, if the existing floor is sound and level and door heights allow it. We decide after the site visit.
Which tile size suits large living rooms?
Large formats (120×60 and above) mean fewer joints and a more refined look, but they need a very flat substrate and a levelling system.
Painting & Wall Finishes
How many days does it take to paint a whole villa?
A mid-size villa takes about 2–3 weeks, including crack repair, filling, sanding, primer and two coats.
Is the paint safe for children's rooms?
We use low-VOC paints for interiors and recommend airing a room for 48 hours before use.
Air Conditioning & Concealed AC
Do you install the AC yourselves?
We design the AC with the ceiling and coordinate its routes and grilles ourselves. The mechanical installation is carried out by a licensed HVAC contractor working under our supervision and our contract, so one company stays answerable to you for the result.
Lighting & Electrical Fit-Out
What colour temperature suits a majlis?
Warm white (2700–3000 K) brings out the warmth of timber and fabrics. Neutral white (4000 K) suits a prep kitchen better.
Villa & Commercial Renovation
What if you find a problem behind the walls?
We photograph it and send you the fix and its cost in writing before any extra work. No surprises on the invoice.
Didn't find your question?
Send the details in 30 seconds and your project engineer will call within two working hours.